Mercedes-Benz Water Reuse Case Study

Automotive Manufacturing

Mercedes-Benz

South Carolina

Deployed: Ginseng
Mercedes-Benz

The Challenge

Mercedes-Benz's South Carolina facility generates significant cooling tower blowdown water. Traditional disposal methods created recurring hauling costs and wasted a potential water resource that could be recirculated back into operations.

4Earth Solution

4Earth deployed its containerized Ginseng system to treat cooling tower blowdown onsite. The system removes dissolved solids, silica, and scale-forming minerals, producing water clean enough to recirculate directly back into the cooling loop — reducing freshwater intake and eliminating discharge costs.

Results

Water RecoveryComing soon
Hauling ReductionComing soon
Freshwater SavingsComing soon